A light filled kitchen extension with double doors to the patio, a large skylight and contemporary kitchen styling. Scroll down to see photos of work in progress and original rear extension.
A light filled kitchen extension with double doors to the patio, a large skylight ...A beautiful dormer style cottage complete with aluclad glazing and underfloor heating
A beautiful dormer style cottage complete with aluclad glazing and underfloor ...Single story extension in citywest
Single story extension in citywestA single story rear extension in Finglas Co. Dublin. Our client needed an extra bedroom in this two bedroom home so we converted the original kitchen into an extra bedroom. A new kitchen and utility room were created by extending to the rear of hour house. In addition, we fitted new tiles, doors and floors as well as a beautiful sandstone patio in the garden. This project took 7 weeks from start to finish. Scroll down to see photo of house before the extension and some work in progress photos.
A single story rear extension in Finglas Co. Dublin. Our client needed an extra ...Our client needed a small extension to the rear to extend the sitting room. This involved knocking out the ground floor wall and propping up the house by installing a large steel beam and posts. We re-used the original door and window and installed 2 velux roof windows .The project also included laying laminate flooring throughout the ground floor. The job was complete in 4 weeks even with some of the worst Winter storms we'd ever experienced.
Follow the work in progress of the project in our photo diary.
Our client needed a small extension to the rear to extend the sitting room. ...This was our second job for the clients in the Shankill. We had previously built a porch.
This time they needed a new layout. The clients home is a 3 bed semi-d house with the bathroom downstairs. With 3 kids, the layout of the house was not suiting their needs so we designed a new layout to make the house work for them . We converted the upstairs in to 3 bedrooms and a bathroom. We put in a new storage tank, insulated all the external walls and reskimmed the whole upstairs. This job took under 3 weeks to complete. Scroll down to see photos of work in progress.
This was our second job for the clients in the Shankill. We had previously built ...